| opportunityforblythe.com |
|||||||||||
| HOME |
|||||||||||
| The Air-Photo below was taken in May 2005 when the Silver Creek Reservoir was being drained in preparation for dam rehabilitation. In late 2005, the reservoir was refilled by pumping water from the Caparell Pit. See ground photos at page bottom of the pumping and pipeline system used to convey water from the Caparell Pit to the Silver Creek Reservoir. |
|||||||||||
![]() |
|||||||||||
![]() |
|||||||||||
| HOME |
|||||||||||